Abstract

The use of risk assessment in the nuclear industry began in the 1970s as a complementary approach to the deterministic methods used to assess the safety of nuclear facilities. As experience with the theory and application of probabilistic methods has grown, so too has its application. In the last decade, the use of probabilistic safety assessment has become commonplace for all phases of the life of a plant, including siting, design, construction, operation and decommissioning. In the particular case of operation of plant, the use of a ‘living’ safety case or probabilistic safety assessment, building upon operational experience, is becoming more widespread, both as an operational tool and as a basis for communication with the regulator. In the case of deciding upon a site for a proposed reactor, use is also being made of probabilistic methods in defining the effect of design parameters. Going hand in hand with this increased use of risk based methods has been the development of assessment criteria against which to judge the results being obtained from the risk analyses. This paper reviews the use of risk assessment in the light of the need for acceptability criteria and shows how these tools are applied in the Australian nuclear industry, with specific reference to the probabilistic safety assessment (PSA) performed of HIFAR.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.