Abstract
This paper aimed to investigate the unrelated parallel-machine scheduling with deteriorating jobs and rejection. The objective is to find the rejected jobs, the non-rejected jobs, and the optimal non-rejected job sequence so that the cost function that includes the weighted of total load, total completion time, and total absolute deviation of completion time plus the total penalty of the rejected jobs would be minimized. Results showed that the problem is polynomial time solvable when the number of machine is fixed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.