Abstract

Abstract In July 2005 during Tropical Storm Cindy the pressure balance safety joint on the 8" crude oil riser at the West Delta 109A platform was separated. Subsequently, measures were taken to de-oil the first 5000ft. of the separated end of the pipeline. Before further action could be taken, Hurricane Katrina passed through the area resulting in further movement of, and substantial damage to, the pipeline. Divers did locate the line at a point some 4500ft from the platform and subsequently discovered that some 7000ft. of it was buried under mudslides further downstream of the platform. The pipe line damage could not be repaired due to its' being buried under mudslides, therefore a unique approach was taken. Cuts were made at each end of the damaged pipeline, flanges and shut off valves were installed and a 4" pipe riser was then made up to one end, picked up and tied back to the service barge some 500 ft away thus creating an engineered radius suitable for coiled tubing (CT) operations. The CT unit was then made up at an angle of 15° to the vertical and an inflatable plug run into the riser, thence into the 8" line until it could go no further. The plug was then inflated and tested, the disconnect was activated and the crude oil in the line flushed out with sea water to the barge tanks until the returns were clean. The CT was pulled leaving the plug in place and the same procedure was repeated at the other end of the damaged section. In this way some 4190ft of the buried line was safely de-oiled leaving the balance isolated between the two inflatable plugs. In this paper the authors will review the pipeline damage and discuss the various options considered to make the line safe and prevent leakage and environmental damage in the future. They will go on to describe in detail the preparation for, and the successful performance of, this CT deployment, the first of its' kind in the Gulf of Mexico. They will conclude that this pioneering operation can serve as a model for several such pipeline situations which the MMS has mandated should be fixed by 2010.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.