Abstract

In 2015, the State of Nevada reduced prevailing wage rates on education-related construction to 90 percent of the applicable rate for other state-funded construction. The examination of projects built for Clark County School District between 2009 and 2108 indicates that Nevada’s wage policy has no statistically significant effect on school construction costs or bid competition, taking into consideration bids placed before and after the 2015 policy change. However, prevailing wage reductions on education projects motivated union contractors to pursue other opportunities as Nevada’s building industry expanded after 2015. Reduced participation in district bidding by union contractors contributed to a 25-percent overall decrease in bid competition and a 20-percent increase in bid costs following the 2015 policy change. While the goal of the 90-percent prevailing wage rule was to reduce the cost of building public schools, unforeseen consequences contributed to decreased bid competition and increased construction costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.