Abstract

This paper develops the cost of change function under the Continuous Improvement (CI) paradigm advocated by quality gurus such as Deming, Taguchi, and Shingo. CI is considered to be focusing on frame bending or minor changes while Organizational Change (OC) is considered to be focusing on frame breaking or major changes. The cost of change function is modified to be a discrete function incorporating a monitoring cost component and a doing cost element, which leads to a better understanding of the multiple tradeoffs: a) between the number of smaller steps to be taken to achieve the desired or planned change and the total cost of change, and b) between the total cost of change and the time needed to achieve the desired change. It is proposed to seek validation of the modified cost of change function by interviewing senior management personnel, who have project management and/or change management experience, such as managing six-sigma projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.