Abstract

In this paper, we consider an uncertain project scheduling problem, in which activity durations, with no historical data generally, are estimated by belief degrees and assumed to be uncertain variables. To achieve different management goals, we build three uncertain chance-constrained programming models for project scheduling problem, in which the chance constraint must reach a predetermined confidence level. Moreover, these models can all be transformed to their crisp forms, and an intelligent algorithm is designed to search the optimal schedule. Finally, a numerical example is presented to illustrate the usefulness of the proposed model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.