Abstract

This study considers a class of two-machine flow-shop scheduling problems with job delivery coordination. Both vehicle capacity and transportation times are also investigated. The objective is to minimize the mean arrival time of jobs. Two integer programming models are developed to optimally solve this problem. These two integer programming models are Models 1 and 2. Model 1 adopts the concept of assignment problem to formulate the proposed problems, while Model 2 bases on the dichotomous constraints models. Model 2 is theoretically better than Model 1 in size complexity analysis.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.