Abstract

This paper considers scheduling in a two-machine flow shop to maximize the total early work subject to a common due date. The early work of a job is a parameter defined as the total amount of the job that is processed before the specified due date. We mainly focus on the unweighted model in this paper, and propose a dynamic programming approach running in O(n2d2) time (compared with the previous result in O(n2d4) time for the weighted case discussed in the literature). Then we analyse the problem from an approximation point of view, in which we first show that Johnson’s algorithm, one of the most classical ones in flow shop scheduling, can only achieve the worst performance ratio for the considered problem (although it is an optimal one for makespan minimization). With the motivation of proposing better approximation algorithms, we further design a fully polynomial time approximation scheme (FPTAS). Finally, we point out that the approximation results also work for the weighted model - if a specific constraint is satisfied.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.