Abstract

In real-world industrial environments, unplanned events and unforeseen incidents can happen at any time. Scheduling under uncertainty allows these unexpected disruptions to be taken into account. This work presents the study of the flexible job shop scheduling problems (FJSP) under machine breakdowns. The objective is to solve the problem such that the lowest makespan is obtained and also robust and stable schedules are guaranteed. A two-stage particle swarm optimization (2S-PSO) is proposed to solve the problem assuming that there is only one breakdown. Various benchmark data taken from the literature, varying from Partial FJSP to Total FJSP, are tested. Computational results prove that the developed algorithm is effective and efficient enough compared to literature approaches providing better robustness and stability. Statistical analyses are given to confirm this performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.