Abstract
This paper describes two heuristics for the basic economic order quantity and economic production quantity with partial backordering that use the time between orders and the percentage of demand filled from stock as the decision variables. Tests of the heuristics on a set of problems generated by using different values for six situational characteristics indicate that both heuristics should perform well as long as the critical value of the backordering rate is positive and very well if it is at least 0.50.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Information Systems and Supply Chain Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.