Abstract

In enterprise management, there are often multiple agents competing for the same products to reduce production cost. On this basis, this paper investigates a two-agent slack due-date single-machine scheduling problem with deteriorating jobs, where the processing time of a job is extended as a function of position-dependent workload, resource allocation and a common deterioration rate. The goal is to find the optimal sequence and resource allocation that minimizes the maximal value of earliness, tardiness, and decision variables of one agent subject to an upper bound on cost value of the second agent. Through theoretical analysis, a polynomial time algorithm with O(N3) time is proposed for the problem, where N is the maximum number of jobs between the two agents.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.