Abstract

The Homasi gold mine concession extends over an area of 116 km2 and situated within a forested plateau physiographic region with elevations of 150–300 m above mean sea level. The concession was acquired by Ashanti Goldfields Company Limited (subsequently AngloGold Ashanti (Ghana) Limited) in November 2001. Mining activity commenced in June 2002 using conventional open pit methods. The excavated materials were hauled using rear-dump trucks for processing at existing oxide treatment plant located 20 km from the mine site. Mining activity was terminated in December 2003 and by 2005, the pit was filled with water with an estimated maximum depth of 45 m at daylight elevation. Under Ghana’s statutory laws, AngloGold Ashanti Ltd was obliged to decommission its activity by rehabilitating the affected areas including backfilling the pit among other obligations, and to restore it to its original state after terminating its operations. However, mindful of the impecunious state of the surrounding communities, the company applied to the Ghana Environmental Protection Agency (GEPA), through the decommissioning plan, for approval to install a sustainable development project that had the potential of transforming the mined-out pit into an internationally acceptable community asset with tourism potential, as an alternative plan to backfilling the pit. That singular act also has the potential to create livelihood projects and to reduce poverty and undernourishment within the riparian communities. Three major areas of activity were earmarked for action. These are: conversion of the mined-out pit into an aquaculture fish producing facility; suitably stabilise all the slopes of the high-grounds (waste rock dumps) and revegetate the area using indigenous forest trees; convert part of the banks of the pit into an amenity beach with well-engineered slopes and summer huts; and for its long term goals build 30 self-catering chalets, a swimming pool, gymnasium and a football field within the area of the closed mine. The facility in its full development will also have a scarp-walkway installed across the 120 m width span of the mined-out pit, at approximately 100 m above daylight elevation. Community farms comprising of fish farms integrated with livestock and leafy vegetable farming that recycle all ‘wastes’ for reuse in an environmentally friendly manner are being installed as a special package for the community. The project will be handed over to the communities to run as independent body after installation and a two year trial run. Presently, project installation is about 70% complete and offers employment to 40 people with a potential for additional 100 jobs at full project installation. This new approach adopted for mine closure by AngloGold Ashanti Ltd significantly demonstrates how a mined-out pit, seen as a liability to the communities, could be transformed into a legacy of hope in the form of sustainable projects that meet the needs of its stakeholders. The project design, installation and initial results, its impact on the environment, the role played by the communities in project installation and management and cost benefit analysis of this project, which has an initial capital outlay of US$ 880,000, is presented and its sustainability discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.