Abstract
This article aims at targeting the minimum electricity outsourced from the grid and the minimum battery capacity for temporal storage of surplus power in a HPS (hybrid power systems) with known power demands and RE (renewable energy) sources. The given continuous or intermittent power demands and RE supplies can be AC (alternating current) or DC (direct current) with known average power ratings without uncertainty. An ETM (expanded transshipment model) is proposed to determine the allocation of electricity generated from RE sources as well as the storage and outsourcing policies for electricity surplus and deficit. This model also considers possible power losses from the conversion between AC and DC, the charging (for storage) and discharging of electricity (to supplement RE supply), and self-discharge during storage. The problem of targeting the electricity outsourcing and storage for an HPS is formulated as a LP (linear program). A literature example is used to demonstrate the application of the proposed ETM. The promising results show that the proposed model can provide preliminary analysis for optimal power management in an HPS, and is an improved method compared to the PPA (power pinch analysis).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.