Abstract

The purpose of the paper is to analyze and improve the transient stability of an industrial combined heat and power (CHP) system in a high-tech science park in Taiwan. The CHP system installed two 161 kV/161 kV high-impendence transformers to connect with Taipower System (TPS) for both decreasing the short-circuit fault current and increasing the fault critical clearing time. The transient stabilities of three types of operation modes in CHP units, 3G1S, 2G1S, and 1G1S, are analyzed. Under the 3G1S operation mode, the system frequency is immediately restored to 60 Hz after tie line tripping with the TPS. Under the 1G1S and 2G1S operation modes, the system frequencies will continuously decrease and eventually become unstable. A novel transient stability improvement approach using load shedding technique based on the change in frequency is proposed to improve the transient stability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.