Abstract

In light of the 2011 Fukushima disaster, recent discussion has focused on finding the best nuclear storage options, maximizing the oversight power of global institutions, and strengthening safety measures. In addition to these, the development of dependable liability coverage that can be tapped in an emergency is also needed and should be considered thoughtfully. To succeed, financing is essential using special-purpose instruments from the global bond market, which is as big as US$175 trillion. Thus, in this paper, for the first time, a two-coverage-type trigger nuclear catastrophe (N-CAT) risk bond for potentially supplementing the covering of U.S. commercial nuclear power plants (NPPs) beyond the coverage per the Price Anderson Act as amended, and potentially other plants are proposed and designed worldwide. The N-CAT peril is categorized by three risk layers: incident, accident, and major accident. The pricing formula is derived by using a semi-Markovian dependence structure in continuous time. A numerical application illustrates the main findings of the paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.