Abstract
Timeliness is very important in large agricultural projects, which are characterized by large areas requiring different numbers and sizes of agricultural equipment. In order to choose the best equipment, and give the right management decisions. The intelligent manager must be aware of the optimum planting time, because the varying in the time of planting on sawing date leads to loss of productivity called (Timeliness) may reach about half of the crop.Determining the optimum time for planting is important to reduce the costs of declining yield due to timeliness and to obtain the highest yield from the farm.This research aims to cover these point machine sizes and operational available time affected the crop net return. Timeliness coefficients’ equation was adjusted for famous Egyptian crops, for maximum crop yield to avoid the early or late establishment crop yield losses.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Soil Sciences and Agricultural Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.