Abstract

Background:The survival rate of cemented knee prosthesis depends among other factors on optimal cement-bone contact, nevertheless no standard exists for cementing technique of tibial components. The aim of this study was to determine which tibial surface preparation technique leads to the best bone-cement contact.Materials and Methods:Human tibial plateau specimens were cleaned in four different ways before cementing: a) no cleaning, b) manual syringe irrigation, c) fracture brush cleaning, and d) pulsatile jet-lavage. The specimens were cut into transverse sections and the bone cement contact distance was calculated for every 10 mm and the cement penetration depth was measured. Both values were statistically analyzed (ANOVA).Results:The longest bone-cement contact (62 mm) was seen after PJL, the shortest (10.6 mm) after no cleaning at all. The deepest cement penetration (4.1 mm) again was seen after PJL, the least (0.7 mm) after no cleaning. Statistically, PJL yielded the longest bone-cement contact and deepest cement penetration.Conclusion:The results supports the use of pulsatile jet-lavage before cementing tibial components in knee arthroplasty.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.