Abstract
Lately, hydraulic Fracturing become common stimulation to improve economic by increase production and adding reserve through unconventional play from tight sand reservoir. The fracturing treatment creates highly conductive pathway to enhance production and well drainage which lead to add reserves. Mostly, Hydraulic Fracturing treatment had been performing in new development wells of infill wells. After successful resulted hydraulic fracturing campaign in new infill wells, there was a trial to perform hydraulic fracturing in existing well thru existing tubing completion. First well which was selected as first to perform remedial frac, thru tubing hydraulic fracturing is consider as a cheaper way to perform rigless hydraulic fracturing compare to hydraulic fracturing with rig. The main challenges during operational come from limitation of existing completion, several adjustment in design and operational should be perform to optimization during fracturing job. This paper presents the experience including fracturing limitation and fracturing design during performing first thru tubing hydraulic fracturing in tight sand reservoir in Offshore North West Java.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.