Abstract

In this paper we consider the nonsimultaneous multiprocessor scheduling problem, or NMSP for short. The NMSP is a makespan minimization scheduling problem which involves the nonpreemptive assignment of independent jobs on m parallel machines with different starting times. It is well known that the longest processing time (LPT) algorithm and the modified LPT(MLPT) algorithm yield schedules with makespans bounded by 3 2 − 1 2m and 4/3 times the optimum makespan, respectively. In this paper, we show that the best known worst-case performance bound, 4/3 of the MLPT, is tight by constructing a worst-case example. Then, we employ the bin-packing heuristic algorithm called the MULTIFIT to solve the NMSP and show that the makespan of the schedule generated by the MULTIFIT algorithm is bounded by 9/7+2 − k times the optimum makespan, where k is the selected number of the major iterations in the MULTIFIT. This worst-case bound of the MULTIFIT algorithm is, so far, the best bound for the NMSP and the tightness of the bound is still an open question.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.