Abstract

Conclusions are reached through the use of questionnaires obtained from contractors who have performed on construction management projects. A tabulation of the results shows the comments about the projects surveyed were favorable from the specialty contractors. Less favorable comments were received about design changes or modifications made after award of the contract. Following a work plan, awarding contracts in an ethical manner and prequalifying contractors is necessary for a successful project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.