Abstract

At junction of Heng dong Count Shi Ji Road and Zang Qing Road, its subgrade soil is almost miscellaneous fill. Based on the analysis of the basic characteristics of miscellaneous fill subgrade and the local climate and traffic load, we apply the Dynamic compaction method consolidate to the Miscellaneous fill foundation and replace the conventional road with continuous reinforced concrete pavement (CRCP). This paper provides the Continuous reinforced pavement design method and a reference for similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.