Abstract
ABSTRACTRobust offline gains occur during explicit motor sequence learning. However practice of a motor sequence, other than the target sequence, within 4–6 hr after initial practice interferes with these gains. This work assessed if experiencing supplemental practice of spatially or motorically similar sequences influenced the extent of offline gain. A contemporary model of sequence learning assumes that exposure to a spatially but not motor-related sequence would not compromise stabilization of the memory for the target sequence, thus, would have minimal impact on the resultant offline gain and possibly amplify overnight gains. As anticipated, a reliable offline improvement was observed for the target motor sequence in the absence of practice with an alternative motor sequence. This gain was significantly reduced when the learner experienced additional practice with either a novel or motorically similar sequence. There was no evidence of heightened overnight gain for the target sequence from intervening practice with a spatially similar sequence. Thus, the expression of offline improvement is not necessarily eliminated if practice of an alternative motor sequence is encountered shortly after a target sequence. However, the structure of the motor sequence faced during intervening practice can impact the resultant postpractice consolidation processes reflected in the eventual expression of offline facilitation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.