Abstract
The straight vacuum chambers (S-chamber) of the SRRC 1.3 GeV electron storage ring are designed, fabricated and tested. Vacuum pipes, bellows, flanges, pumping ports and most of the other components are made of aluminum. The S-chambers are designed to have the function of reducing radio-frequency ( rf) impedance and removing the heat created by synchrotron radiation. A stringent tungsten-inert gas (TIG) welding process is performed to minimize the deformations in both longitudinal and transverse directions. In order to achieve uhv, in situ bakeout by tape heaters is adopted. The testing results showed that the designs for removing the baking-related problems work well.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.