Abstract

This paper presents an interactive trading decision between an electricity market operator, generation companies (GenCos), and the aggregators having demand response (DR) capable loads. Decisions are made hierarchically. At the upper-level, an electricity market operator (EMO) aims to minimise generation supply cost considering a DR transaction cost, which is essentially the cost of load curtailment. A DR exchange operator aims to minimise this transaction cost upon receiving the DR offer from the multiple aggregators at the lower level. The solution at this level determines the optimal DR amount and the load curtailment price. The DR considers the end-user’s willingness to reduce demand. Lagrangian duality theory is used to solve the bi-level optimisation. The usefulness of the proposed market model is demonstrated on interconnection of the Pennsylvania-New Jersey-Maryland (PJM) 5-Bus benchmark power system model under several plausible cases. It is found that the peak electricity price and grid-wise operation expenses under this DR trading scheme are reduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.