Abstract

The objective of this research was to determine the optimal maintenance time interval for the selected critical components and the total cost of maintenance of a plastic injection machine. In determining the critical components, a risk matrix was used, and three components were selected, namely, hydraulic hose, barrel, and motor. Using the Reliability and Risk Centered Maintenance (RRCM) method, the researchers got a proposed maintenance policy and the total maintenance cost. Based on the result, it shows that there are seven proposed maintenance tasks with three scheduled oncondition tasks and four scheduled restoration tasks with an average maintenance interval of two months. The total maintenance cost proposed is IDR91.595.318. The cost is smaller compared to the actual maintenance costs of the company.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.