Abstract

In the classic minimum makespan scheduling problem, we are given an input sequence of jobs with processing times. A scheduling algorithm has to assign the jobs to m parallel machines. The objective is to minimize the makespan, which is the time it takes until all jobs are processed. In this paper, we consider online scheduling algorithms without preemption. However, we do not require that each arriving job has to be assigned immediately to one of the machines. A reordering buffer with limited storage capacity can be used to reorder the input sequence in a restricted fashion so as to schedule the jobs with a smaller makespan. This is a natural extension of lookahead.We present an extensive study of the power and limits of online reordering for minimum makespan scheduling. As main result, we give, for m identical machines, tight and, in comparison to the problem without reordering, much improved bounds on the competitive ratio for minimum makespan scheduling with reordering buffers. Depending on m, the achieved competitive ratio lies between 4/3 and 1.4659. This optimal ratio is achieved with a buffer of size Theta(m). We show that larger buffer sizes do not result in an additional advantage and that a buffer of size Omega(m) is necessary to achieve this competitive ratio. Further, we present several algorithms for different buffer sizes. Among others, we introduce, for every buffer size k

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.