Abstract
On Saturday, 6 May 2006, the launching of the deck superstructure of the Izbor viaduct resulted in the partial collapse of the front section of the launched deck. The construction process of launching the deck was aided by a tower and supporting cable-stayed system. This paper describes the investigation, including on-site material inspections and in-depth analysis, which was carried out to determine the likely cause of the partial collapse. The design and construction deficiencies, which were identified during the assessment of the viaduct, allowed an understanding of the anatomy of the partial failure. Following the investigation, the mystery of the Izbor viaduct was revealed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Institution of Civil Engineers - Bridge Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.