Abstract

SUMMARY The problem of the layout of multi-product lines is considered as an integral part of production system planning. The paper discusses the stages in production system planning and identifies five types of system. The layout of multi-product lines involves determining the number of stations in the line, the machine type at each station, and the station at which each operation is to be performed. The problem is described in the context of work flow and work load. A special case, the single machine case, is identified and some methods for its solution discussed. A procedure for solution of the general case is proposed, consisting of these stages: construction of a line with uni-directional flow; elimination of uneconomic work stations; and simulation of alternative line configurations. The method is illustrated by a case study.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.