Abstract

Incremental launching erection is a widely construction technology, which has the advantages of low cost, low environmental requirements, simple equipment. In this project, the multi-point support rolling device is used instead of the linear or planar slide support system, and the short nose bridge-fishing method is further used to realize the smooth pier of the beam body. According to the site, a simple and easy deviation correction device is designed. According to the simulation results of deflection calculation and field deflection measurement data, the construction monitoring of the process of incremental launching was carried out, and the incremental launching construction was successfully completed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.