Abstract

This paper considers the integration of three essential seaport terminal operations: the berth allocation problem, the quay crane assignment problem (QCAP), and the quay crane scheduling problem (QCSP). The paper presents a new mathematical formulation that captures all associated operations and constraints. Different quay crane operational policies are considered, namely permitting versus not permitting bay task preemption in QCSP and static versus dynamic crane allocations in QCAP. Thus, variants of the mathematical formulation are introduced to capture the different combinations of these scenarios. Due to the preemption consideration, the models include disaggregated quay crane (QC) tasks. Specifically, QC tasks are identified by single container movements as opposed to bay or stack task allocations that are commonly used in the literature. A case study based on Abu Dhabi’s container terminal is presented where the use of the proposed mathematical models are compared against the current existing operational approach. Results show that the service times can be significantly decreased by the use of the proposed models. Moreover, the policy choice effect on the total schedule is compared through simulated examples and Abu Dhabi’s container terminal case study. The results show that the policy improvements can depend on the problem’s attributes and thus a better policy cannot be generalized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.