Abstract

This paper does not necessarily reflect the views of the International Commission on Radiological Protection.This article describes the institutional structure established for decommissioning Fukushima Daiichi nuclear power plant. To deal with the aftermath of the unprecedented nuclear accident in Fukushima, several responsible institutions such as Ministry of Economy, Trade and Industry (METI), Ministry of Education, Culture, Sports, Science and Technology (MEXT) have worked together at the initiative of the Government of Japan. In this structure, Tokyo Electric Power Company Holdings (TEPCO) implements the decommissioning due to its legal responsibility, while the essential direction and milestones are set by the Nuclear Emergency Response Headquarters of the Government of Japan. Nuclear Damage Compensation and Decommissioning Facilitation Corporation, a government-affiliated organisation, oversees and facilitates the decommissioning by TEPCO, and the Nuclear Regulatory Authority regulates safety from an independent standpoint. The main basic elements essential for the success of this long-term project have been developed, such as the technical strategy, financial system, and organisational capability. Decommissioning is making progress.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.