Abstract
In recent years there has been a significant change in the distribution of wind farms in Great Britain, with a trend towards very large offshore farms clustered together in zones. However, there are concerns these clusters could produce large ramping events on time scales of less than 6 h as local meteorological phenomena simultaneously impact the production of several farms. This paper presents generation data from the wind farms in the Thames Estuary (the largest cluster in the world) for 2014 and quantifies the high frequency power ramps. Based on a case study of a ramping event which occurred on 3rd November 2014, we show that due to the large capacity of the cluster, a localised ramp can have a significant impact on the cost of balancing the power system on a national level if it is not captured by the forecast of the system operator. The planned construction of larger offshore wind zones will exacerbate this problem. Consequently, there is a need for accurate regional wind power forecasts to minimise the costs of managing the system. This study shows that state-of-the-art high resolution forecast models have capacity to provide valuable information to mitigate this impact.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.