Abstract
Recently, in Japan, “ICOS” Method is introduced in earth improvement.On the build of Yagisawa dam, “ICOS” Method was adapted for the cut-off wall construction. This wall was successfully constructed. In this report, the author writes the outline of the construction, and sums up the points for the future.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Japan Society of Engineering Geology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.