Abstract

AbstractAsfinag Baumanagement GmbH has been commissioned to construct the second tube of the Ganzstein tunnel. After completion, it will be possible to travel the entire length of the S6 expressway on dual carriageway. This investment will improve the connection of the industrial area of the Upper Steiermark with the Vienna Basin and also improve the traffic safety of the busy route. The article describes the current state of the construction works and also makes comparisons with the first tube of the tunnel, which was opened in 1980.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.