Abstract
Yueliangwan Reservoir dam foundation there is fault fracture zone,silty sand layer geological and so on defects,dam foundation of inhomogeneous deformation and seepage problems is the key of the dam foundation treatment.Basis on conducting detailed geological surveying,to take remove foundation,consolidation grouting and replacement process measures to for engineering geological problems of the dam,effectively solve the inhomogeneous deformation and dam foundation seepage problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.