Abstract

To study the efficacy of continuous quality improvement (CQI) compared to ordinary management in an on-duty radiology department. Because of complaints regarding delivery of on-duty radiological services, an improvement was initiated simultaneously at two hospitals, at the HUCH (Helsinki University Central Hospital) utilising the CQI-method, and at the OUH (Oulu University Hospital) with a traditional management process. For the CQI project, a team was formed to evaluate the process with flow-charts, cause and effect diagrams, Pareto analysis and control charts. Interventions to improve the process were based on the results of these analyses. The team at the HUCH implemented the following changes: A radiologist was added to the evening shift between 15:00-22:00 and a radiographer was moved from the morning shift to 15:00-22:00. A clear improvement was achieved in the turn-around time, but in the follow-up some of the gains were lost. Only minimal changes were achieved at the OUH, where the intervention was based on traditional management processes. CQI was an effective method for improving the quality of performance of a radiology department compared with ordinary management methods, but some of this improvement may be subsequently lost without a continuous measurement system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.