Abstract A simulation model is applied to a long series (1918–65) of daily rainfall observations to produce an experimental series of operational records on the weather-sensitive portion of a road building project. These records are analyzed statistically for various periods of time within the normal construction season and the resulting statistics are examined for their potential usefulness in the management of road construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.