In the paper problems related with the execution of 29 m deep excavation of Nowy Swiat Station (S11) of 2nd metro line in Warsaw are discussed. In the central section, Warsaw 2nd metro line runs below the center of the city (office and housing buildings and high traffic roads) as well as below Vistula river. This central section consists of 7 stations and 6 running tunnels – 6 km length in total. Running tunnels will be constructed using TBM, stations – cut and cover method. Deep excavation will be executed within diaphragm walls. The stability of the walls will be provided by several levels of slabs and struts. The analysis of settlements of ground surface, surrounding foundations and displacements of walls of the excavation have been made. Additionally, settlements of the surface were calculated above the TBM (running tunnels). Resulting values of settlements in both cases were compared and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.