Abstract

The combining multistage interconnection network uses 4*4 switches as switching elements and introduces an extra stage of such switches and links to create four independent paths between any source-destination pair. Four copies of every message are sent through the network simultaneously. The scheduling discipline, the design of the switching elements to support the discipline, and the theoretical proof of correctness of the design constitute the key contributions of this study. Estimates are provided of various network parameters as a function of the workload, using analytical models and detailed network simulations. It is shown that the proposed design for fault tolerance is more cost-effective than the brute-force technique of having multiple copies of the network. >

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.