Abstract
AbstractThis paper deals with the problem of scheduling items (tasks, employees, equipment, etc.) over a finite time horizon so as to minimize total cost expenditures while maintaining a predefined separation between certain items. The problem is cyclic, because the same schedule will be repeated over several consecutive time periods of equal length. Thus, requirements are present to maintain the separation of items not only within the individual time periods considered, but also between items in adjoining periods. A special purpose branch‐and‐bound algorithm is developed to solve this scheduling problem by taking advantage of its cyclic nature. Computational results are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.