Abstract
As the stress measurement of interior concrete is hard in the construction control of the cable- stayed bridge, a new method fitted for stress measurement in large span PC concrete cable-stayed bridge is proposed in this paper. This method is based on the principle that the normal stress in neutron-axis of girder is only decided by the horizontal part of the cable force. First, the normal stress on the neutron-axis of girder is calculated by the measured cable force, and then the creep coefficient is identified, and finally the other stresses are worked out. This method has been applied to a large span PC cable-stayed bridge constructed in process with favourable results and thus proves its accuracy and efficiency.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.