Abstract

The aim of the paper is to set priority of The Fast Connection sections ("Rychlá spojení" in Czech, abbreviation "RS") building mentioned above by using the STEM method. The method is used to select projects with the maximum benefit if the budget is limited. There has not been set a limit for individual RS sections as a limitation of financial costs. The decisive factor is the order in which individual RS sections should be built on the basis of evaluation criteria.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.