Abstract

This paper describes the establishment of defense systems test works architecture model for the efficient operation of an expanded test organization and the provision of standardized test services after the integration of proving grounds in ADD. The system engineering vee model is applied to the defense system test works to define the project management model and the unit-test management model. In order to establish the defense systems test works architecture model, the process flow of test works, artifacts by life cycle, and interrelations between regulations and test works are explained, and Integrated Test Information System for implementation of architecture model is discussed. Through the defense systems test works architecture model presented in this study, it will contribute to quickly responding to the test requirements of complex and diverse defense systems, efficiently managing projects, and providing standardized test services.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.