Abstract
This paper reports on the application of systems engineering tools, either used or developed by the Systems Engineering Team of Trains Delivery Group, supporting all areas of London Underground Limited (LUL). It focuses on three Major Projects which have applied them to varying degrees. Central and Northern Line Projects have made use of a suite of simulators developed in-house to gain early understanding of system issues such as power supply and demand, signalling capability and possible levels of train service. Jubilee Line Extension Project have made use of tool to support requirements management. It concludes that benefits to LUL has been demonstrated by the application of these tools.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.