Abstract

Due to non-balance among some workstations in a electronic production packaging line, according to the application of work study, 5W1H and ECRS principles, combined with the principles of line balancing the bottle-neck section of packaging line was studied and a new scheme was put forward, which makes the rate of two production line balance upgrade 22% and 15%, and 5standard manpower was saved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.