Abstract

AbstractThis study of production operations in 95 New Jersey manufacturing firms explains the widely replicated curvilinear relationship between first line supervisory span of control and Woodward's technological complexity scale. Revisiting Woodward led to the initial proposition that the relationship was a by‐product of the differing degree of task variability among the major types of production operations. A subsequent literature review of administrative requirements suggested the importance of size, complexity and automaticity on supervisory span of control. Our data indicate that variations in the span of control of production operations classified according to Woodward's scale are attributable to the underlying effects of size and task complexity. Technology, whether operationalized as Woodward's production types or automaticity of machinery explained little variation in the span of control of first line supervisors.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.