Abstract

Due to the lack of appropriate policies in the last decades, 60% of Brazilian cities still dump their waste in non-regulated landfills (the remaining ones dump their trash in regulated landfills), which represent a serious environmental and social problem. The key objective of this study is to compare, from a techno-economic and environmental point of view, different alternatives to the energy recovery from the Municipal Solid Waste (MSW) generated in Brazilian cities. The environmental analysis was carried out using current data collected in Betim, a 450,000 inhabitants city that currently produces 200 tonnes of MSW/day. Four scenarios were designed, whose environmental behaviour were studied applying the Life Cycle Assessment (LCA) methodology, in accordance with the ISO 14040 and ISO 14044 standards. The results show the landfill systems as the worst waste management option and that a significant environmental savings is achieved when a wasted energy recovery is done. The best option, which presented the best performance based on considered indicators, is the direct combustion of waste as fuel for electricity generation. The study also includes a techno-economical evaluation of the options, using a developed computer simulation tool. The economic indicators of an MSW energy recovery project were calculated. The selected methodology allows to calculate the energy content of the MSW and the CH4 generated by the landfill, the costs and incomes associated with the energy recovery, the sales of electricity and carbon credits from the Clean Development Mechanism (CDM). The studies were based on urban centres of 100,000, 500,000 and 1,000,000 inhabitants, using the MSW characteristics of the metropolitan region of Belo Horizonte. Two alternatives to recovering waste energy were analyzed: a landfill that used landfill biogas to generate electricity through generator modules and a Waste-to-Energy (WtE) facility also with electricity generation. The results show that power generation projects using landfill biogas in Brazil strongly depend on the existence of a market for emissions reduction credits. The WtE plant projects, due to its high installation, Operation and Maintenance (O&M) costs, are highly dependent on MSW treatment fees. And they still rely on an increase of three times the city taxes to become attractive.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.