Abstract

Natural gas can be a raw material to produce synthetic liquid fuels via Gas to Liquid process (GTL). The process is consist of 4 main parts which are cleaning unit, reforming unit, Fischer-Tropsch unit (FT) and product upgrading unit. To evaluate potential of having this kind of process for Nongtum A Reservoir, Thailand, technical feasibility of GTL process towards heat integration needed to be done. This work presented a process model, combined heat and power (gas generation) of Nongtum A Reservoir by using the total heat integration concept. Volume of natural gas at Nongtum A Reservoir is 56,634 m3/day at 10 bar, and 40 deg.C. ResuIts of the model simulation are the overall thermal efficiency of 10.32% to 14.88%, gasoline product of 435 to 575 bbl/day, and diesel product of 621 to 947 bbl/day depending upon a split ratio of natural gas to gas generation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.