Abstract

Thermal efficiency, capacity factor, environmental considerations, investment, fuel and O&M 2 2 Operation and maintenance. costs are the main parameters for technical and economic assessment of solar power plants. This analysis has shown that the Integrated Solar Combined Cycle System with 67 MW e solar field (ISCCS-67) is the most suitable plan for the first solar power plant in Iran. The Levelized Energy Costs (LEC) of combined cycle and ISCCS-67 power plants would be equal if 49 million $ of ISCCS-67 capital cost supplied by the international environmental organizations such as Global Environmental Facilities (GEF) and World Bank. This study shows that an ISCCS-67 saves 59 million $ in fuel consumption and reduces about 2.4 million ton in CO 2 emission during 30 years operating period. Increasing of steam turbine capacity by 50%, and 4% improvement in overall efficiency are other advantages of ISCCS-67 power plant. The LEC of ISCCS-67 is 10 and 33% lower than the combined cycle and gas turbine, respectively, at the same capacity factor with consideration of environmental costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.