Abstract

Part 1 of this series of papers presented graphical and algebraic approaches that are used to identify waste streams in a total water network. In this part of the series, the interaction between waste treatment and water regeneration is explored. Appropriate selection of waste streams for regeneration or waste treatment will lead to the minimum impurity load to be processed in the regeneration and waste treatment units; hence, leads to the reduction of the network capital and operation costs. In addition, a novel wastewater composite curve for targeting the minimum impurity load removal is presented in this work. Targeting for the minimum treatment flow rate and the minimum number of treatment units is presented for the treatment system of the fixed outlet concentration and removal ratio type, respectively. Literature examples are solved to illustrate the proposed approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.